Discipline · 06 of 11
Electrical Work
Certified engineers, clean installs, real paperwork.
Overview
Full rewires, boards, lighting design and testing. Everything signed off and issued with the certification you need.
Electrics are the discipline where the finish hides the craft. We route cabling with tolerances that will still make sense in twenty years, terminate boards neatly, and certify everything to Part P.
NICEIC
Registered contractor
Part P
Fully compliant
24/7
Emergency callout
5yr
Install warranty
Our Approach
How the work is run.
Design
Load, circuits and control planned around how you actually live or trade.
Install
First and second fix delivered clean, on time, and to spec.
Certify
EICR, minor works and installation certificates issued on completion.

Scope
What's typically included.
- Full and partial rewires
- Consumer units
- Lighting design and install
- EV chargers and smart controls
- Data and Cat6 cabling
- Emergency lighting and testing
Materials
The palette.
Specifications we return to, and the reasons why.
Hager and Schneider boards
Standardised on trusted manufacturers.
Prysmian LSHF cable
Low-smoke halogen-free throughout.
Lutron and Rako
For scene-based lighting control.
Brass and bronze plate
Where the switch is part of the finish.
“The board is a work of art. Every cable labelled, tested and photographed.”
— Facilities lead, Fitzrovia W1
Selected Work
The work, quietly.
Programme
A typical timeline.
- 01
Survey & test
Week 1
Existing condition report and load calculation.
- 02
Design
Week 2
Circuit schedule, lighting plan, control specification.
- 03
First fix
Weeks 3–4
Cabling, back-boxes, containment.
- 04
Second fix
Weeks 5–6
Boards, accessories, fittings, commissioning.
- 05
Certification
Week 6
Testing, EIC, handover pack.
Deliverables
What you receive.
- EICR condition report
- Full circuit schedule and drawings
- Part P compliance certificate
- 5 year installation warranty
Answers
What clients ask.
Do you handle listed buildings?
Yes. Surface trunking, brass conduit and lifting-and-relaying of floors are all part of our normal work.
Can you design our lighting scheme?
Yes. We produce a full lighting layout and can integrate scene control.
How disruptive is a rewire?
For an occupied home we typically work room-by-room over 2–3 weeks; you will always have power somewhere in the house.

Next Discipline
Gas Work
Explore →Enquire
Discuss a electrical work project.
A conversation, a walk-round, an honest scope. No obligation.