House Extensions

Discipline · 02 of 11

House Extensions

Additions that read as if they were always there.

Overview

Considered structural additions that read as if they were always there. Matched brickwork, sympathetic detailing and glazing that draws the garden in.

The best extensions do not announce themselves. Brick coursing lines up. Ridge heights sit down. New glazing frames the garden without stealing focus from the original house. We build extensions the way conservation officers wish everyone did.

· 01 ·

40+

London extensions delivered

· 02 ·

100%

Planning success rate

· 03 ·

16wk

Typical build programme

· 04 ·

25mm

Slimmest glazing sightline

Our Approach

How the work is run.

01

Feasibility

Planning constraints reviewed alongside your brief before drawings begin.

02

Coordination

Party wall, structural engineer and building control managed on your behalf.

03

Craft

Traditional trades and modern envelope detailing working together.

House Extensions craft

Scope

What's typically included.

  • Single and double storey extensions
  • Wrap-around and side returns
  • Steel and timber structures
  • Bi-fold and slim-frame glazing
  • Underfloor heating and screed
  • Roof lanterns and rooflights

Materials

The palette.

Specifications we return to, and the reasons why.

Handmade London stock brick

Colour-matched to the existing envelope.

Slim aluminium glazing

Sightlines under 25mm on structural glass.

Zinc and lead roofing

Standing seam or traditional weathering.

Oak and Douglas fir

For structural feature beams and cills.

Neighbours ask which brick we used. The truthful answer is 'the same as the house', and that is the point.

Owner, Grade II listed home, Barnes

Programme

A typical timeline.

  1. 01

    Brief & feasibility

    Weeks 1–3

    Planning constraints, party wall exposure and budget sanity check.

  2. 02

    Design & consents

    Weeks 4–10

    Planning, party wall, building control and structural design.

  3. 03

    Substructure

    Weeks 11–14

    Foundations, underpinning if required, drainage.

  4. 04

    Envelope

    Weeks 15–20

    Steelwork, walls, roof, glazing and weathertight.

  5. 05

    Fit-out & finish

    Weeks 21–26

    M&E, plaster, floor, decoration, handover.

Deliverables

What you receive.

  • Planning and building control drawings
  • Structural engineer coordination
  • Party wall surveyor liaison
  • Fully finished, decorated envelope

Answers

What clients ask.

Do we need planning permission?

Many rear extensions fall under permitted development. Anything on a listed building, in a conservation area or beyond PD limits will need consent. We assess this at feasibility.

How do you match old brickwork?

We take physical samples to a handmade brick supplier and dry-lay panels for you to approve before ordering.

Can you work alongside our architect?

Yes. We are frequently novated after planning, or brought on as design-and-build from the start.

Loft Extensions

Next Discipline

Loft Extensions

Explore →

Enquire

Discuss a house extensions project.

A conversation, a walk-round, an honest scope. No obligation.