Overview

Mansard, dormer and hip-to-gable conversions delivered without disrupting the household below.

A good loft gains a bedroom. A great one gains a floor of the house that feels original. We spend as much time on the stair, the head-height and the eaves storage as we do on the roof itself.

· 01 ·

8wk

Typical loft programme

· 02 ·

2.3m

Minimum head-height achieved

· 03 ·

0

Cracked ceilings below

· 04 ·

24/7

Site protection

Our Approach

How the work is run.

01

Assessment

Head-height, structure and access considered from day one.

02

Discretion

Dust screens, protected stairs and considerate working hours.

03

Finish

Skylights, joinery and heating balanced for year-round comfort.

Loft Extensions craft

Scope

What's typically included.

  • Mansard, dormer and hip-to-gable
  • Structural steelwork
  • Insulation and ventilation
  • En-suite plumbing
  • Bespoke fitted storage
  • Conservation slate and lead detailing

Materials

The palette.

Specifications we return to, and the reasons why.

Welsh slate

Where conservation officers expect it.

Zinc-clad dormers

Contemporary but conservation-friendly.

Conservation rooflights

Cast iron effect, flush to the roof plane.

Engineered oak stair

Rift-sawn treads on a discreet steel stringer.

Our neighbours' loft took nine months. Ours took eight weeks, and looks better.

Family home, Islington N1

Programme

A typical timeline.

  1. 01

    Survey

    Week 1

    Head-height, roof structure and stair position resolved.

  2. 02

    Design & consents

    Weeks 2–5

    Planning where required, building regs, structural design.

  3. 03

    Roof off, structure in

    Weeks 6–8

    Scaffold, temporary weathering, steels, dormer framing.

  4. 04

    Envelope & first fix

    Weeks 9–11

    Roof coverings, glazing, insulation, first fix M&E.

  5. 05

    Finish

    Weeks 12–14

    Plaster, joinery, decoration, handover.

Deliverables

What you receive.

  • Structural engineer sign-off
  • Party wall notices served
  • Building regs completion
  • Furniture-grade fitted joinery

Answers

What clients ask.

Will we lose the room below the stair?

Not usually. We design the stair position around your existing plan; we will show you the impact before you commit.

How dusty does it get?

Loft works are the dustiest part of construction. We install a fully sealed dust screen at the head of the existing stair, and vacuum-extract every day.

Can we get a bath up there?

Yes. Steelwork carries the load and we design plumbing runs at design stage.