Discipline · 01 of 11
Full Refurbishments
Whole-property renovation, single point of accountability.
Overview
From Georgian townhouses to boutique commercial units, we deliver end-to-end refurbishments with a single point of accountability, protecting your programme and your finishes.
A full refurbishment is a choreography problem before it is a construction problem. Structure, services, joinery, stone and glass all arrive on the same site, in the right order, with the right protection. Ushii holds every one of those trades in-house, which is why our refurbishments finish on the day we said they would.
12wk
Average programme
18
Trades coordinated
0
Trades subcontracted out
10yr
Workmanship warranty
Our Approach
How the work is run.
Discovery
Site survey, condition report and honest scope discussion before any figure is quoted.
Design & Programme
Sequenced trades, protected finishes and a schedule you can plan a life around.
Delivery
Directly employed teams, weekly walk-throughs and a snag list closed before handover.

Scope
What's typically included.
- Strip-outs and structural alterations
- Bespoke joinery and finishes
- M&E coordination
- Building control sign-off
- Kitchen and bathroom install
- Decoration and specialist finishes
Materials
The palette.
Specifications we return to, and the reasons why.
Reclaimed oak
Sourced from British estates, dried and machined in our workshop.
Honed limestone
Portland, Lecce and Jura stone laid on a proper substrate.
Lime plaster
Breathable finishes correct for period walls.
Solid brass ironmongery
Aged and lacquered rather than plated.
“They ran a Georgian refurb across four floors without a single missed deadline. The finish is what we remember every morning.”
— Private client, Chelsea SW3
Selected Work
The work, quietly.
Programme
A typical timeline.
- 01
Survey & scope
Weeks 1–2
Measured survey, condition report and priced specification.
- 02
Design & consents
Weeks 3–6
Drawings, party wall, building control and long-lead orders placed.
- 03
Strip & structure
Weeks 7–10
Protected access, controlled strip-out and structural works.
- 04
Services & fabric
Weeks 11–16
First fix M&E, insulation, plastering and substrates.
- 05
Finishes & handover
Weeks 17–20
Joinery, stone, decoration, commissioning and a closed snag list.
Deliverables
What you receive.
- Full construction drawings and specification pack
- Weekly progress report with photography
- As-built drawings on completion
- Ten year workmanship warranty
Answers
What clients ask.
Can we stay in the property during works?
Sometimes, for phased works. For anything structural we usually recommend vacating; we will tell you honestly which category yours falls into.
Who manages planning and building control?
We do, alongside your architect if you have one. If you do not, we can introduce practices we work with regularly.
How firm is the fixed price?
Once scope and specification are agreed, the price is fixed. Variations only happen if you change your mind or something unforeseen is uncovered, both discussed before any cost is incurred.

Next Discipline
House Extensions
Explore →Enquire
Discuss a full refurbishments project.
A conversation, a walk-round, an honest scope. No obligation.